Monday 22 May 2017

Offshore vessel construction 2017

Offshore vessel construction design by Izatul Ikhwan for semester 5 ship construction presentation
The beginning of the ship design and the item required
This offshore ship are using the transverse framing system because it length are not exceed 120 meters
Completing of fixing the framing system and ship hull
-This ship first coating is white colour to cover the structure of the hull(box) and the joining part(super glue)
Fully paint by white colour

was fixed with the exhaust, antenna and Christmas tree light  
-continue with the second coating for the ship side hull.
Red colour of the hull looked shine because of the first coating.
-After that, we continue with the third coating for the bottom part which is black in colour. we also make a desing for the ship bridge and put the important navigational light.
Teamwork of group 3 (ikhwan,ehsan,dharrviend)
-final stage is fixing the deck crane, double screw type propeller and the rudder
#heavy load crane 








No comments:

Post a Comment