Offshore vessel construction design by Izatul Ikhwan for semester 5 ship construction presentation
 |
The beginning of the ship design and the item required |
This offshore ship are using the transverse framing system because it length are not exceed 120 meters
 |
Completing of fixing the framing system and ship hull |
-This ship first coating is white colour to cover the structure of the hull(box) and the joining part(super glue)
 |
Fully paint by white colour |
 |
was fixed with the exhaust, antenna and Christmas tree light |
-continue with the second coating for the ship side hull.
 |
Red colour of the hull looked shine because of the first coating. |
-After that, we continue with the third coating for the bottom part which is black in colour. we also make a desing for the ship bridge and put the important navigational light.
 |
Teamwork of group 3 (ikhwan,ehsan,dharrviend) |
-final stage is fixing the deck crane, double screw type propeller and the rudder
 |
#heavy load crane |
No comments:
Post a Comment